Along the A1 near Apeldoorn and Twello, a series of retaining walls made with INVIE have been installed as part of an infrastructure project.
The development of Invie is partly made possible by a grant from the European Commission from the LIFE programme.
At the end of March, plant manager Henri Feijen called the first trial pour of a staircase at ‘his’ Steenhuis a milestone.
We recently conducted a so-called melting campaign at our production facility in Weisweiler (near Aachen).
Lodewikus BetonTrial dump(s) at Lodewikus Lodewikus allowed us to fill the mixer once daily for 5 weeks. This yielded 2.5 m3 of concrete slurry each time.
In recent years, we have been able to test Invie on a project basis within the production environments. At...
BTE Group Managing Director Bart van Melick believes that streams of residues should no longer be seen as waste, but as new raw materials. 'The...
Within the construction industry and specifically within the concrete industry, there are major challenges in the areas of Sustainability and...